Skip to main content
Skip table of contents

Demo for SWM ( Stadtwerke München)

Introduction (JR)

  1. Present people and participants

  2. Give a short Introduction on Helinks and on the Engineering Process (Slides)

Demo (AR)

The demo is based on the material provided by SWM. Demo language is German.

  1. Start the Library Project

    1. Explain that the current project serves to develop and maintain the typicals

  2. Present Dashboard Icons

    1. Three icons at the top define specifications

      1. Single Line Editor for Substations

      2. Process editor: 61850 specification of general electrical systems

      3. Application Editor for data exchange

    2. Namespace editor allows users to create their own namespaces

  3. Single Line Editor and Function Diagram
    Use Kabelabgang to explain

    1. SCL Hierarchy

    2. Function Specification Diagram

      1. Bay Functions

      2. Equipment Functions

      3. Explain Signal List

      4. Virtual IED

      5. Show IED from specification option

      6. Create Distance Protections

        1. Explain Namespace files

        2. Add PDIS and Zone, copy PDIS change Zone (Z1:PDIS, Z2:PDIS)

        3. Add to Library and create second instance of

        4. Delete all the Distance Functions and close Diagram

    3. On the Single line show Add Bay to Library (do not execute)

  4. Create Substation project from Library

    1. Load SWM example library

    2. Create Substation 110kV Voltage Level and 2x2 Bus Bars

    3. Create MMS Client

    4. Instantiate

      1. 2 Kabelabgänger and 1 Transformatorab gangon first Bus Bar pair

      2. 2 Freiluftabgänge and 1 Transformatorabgang on second Busbar pair

  5. Show MMS Report specification (Client Functions)

  6. Demonstrate IEC104 Address calculation

    1. Explain address configuration

    2. Run address creation and show result in Signal List

  7. Show options of import Dialog

  8. Run IED Crafter

  9. Show System Diagram

    1. explain IED instances and IED context menu

    2. Explain Subnet and Subnet connection

    3. Connect crafted IED to SubNet

  10. Load prepared IEs

  11. Show Automatic Mapping

    1. Open Bay 03 and Bay 04 in Parallel

    2. Implement IEDs

    3. Explain Signal List with mappings and IED Type Mappings

  12. Create SCL Configuration

    1. Show Reports in Communication Editor

  13. Export SCD

  14. Show GOOSE Inputs in SCD

  15. Run and Show Documentation

JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.